Offshore structures

AMOCA WHP2 - GULF OF MEXICO - MEXICO - 2020-2021

FEED drawing and TEKLA modeling of the platform AMOCA WHP2 - Gulf of Mexico - Mexico

Depth 28 metri

Height Topside 28 metri

Topside area 900 m2 about (33 m x 32 m) with two level, a lower and mezzanine decks.

 CUSTOMER: ENIPROGETTI SPA

 

 

Kashagan Field Development Experimental Program - Kazakhstan - 2013 - 2015

Detailed design of three steel prefabricated modules EPC 2-3-4 - Kashagan Field - Experimental Program Cluster - Kazakistan.

CUSTOMER: SAIPEM SPA

Jacket Platform Elettra - ENI E&P – Adriatic Sea - 2013

Detailed design of the jacket of the Elettra Platform -  ENI E&P - Adriatic Sea - Italy

Depth 78 metri

Analisys in-service condition, fatigue, load-out, sea trnsportation, lifting e on-bottom

ICHTHYS UPSTREAM PROJECT - Australia - 2013

Fatigue and in service analysis of two high temperature flue gas exhaust ducts located downstream of two turbines positioned on the semi-submersible platform of the Ichthys Upstream Project - AUSTRALIA.

The plant, located off the coast of Australia, processes condensed gas, extracted from the offshore field, separating it from the liquid part and transporting it, via a subsea gas pipeline, to the LNG Storage Plant near Darwin.

CUSTOMER:  NUOVA PIGNONE SPA/ALBIZZATI SPA

Staatsolie Refinery Expansion Project - Suriname - 2011-2012

Detailed structural design of 16 prefabricated steel modules (PAU e PAR) for petrochemical industry. The construction of the whole plant in Italy with the trasportation to the site, located in Suriname, required the analysis of different phases: sea trasportation, river trasportation, lifting, load-out and in-service condition.

CUSTOMER: SAIPEM SPA

 

 

OLT – FSRU Project Livorno - 2008 - 2010

Detailed design of the steel prefabricated modules T20 and T18 (1840 tons) of the Floating Storage and Regasification Unit (F.S.R.U.) - O.L.T. Project - located off the coast of Livorno (Italy) in the Tyrrhenian Sea. The construction of the modules in United Arabic Emirate field required the analysis of different phases: sea trasportation with grillage and seafastening, lifting, load-out and in-service condition.

CUSTOMER: SAIPEM ENERGY SERVICES SPA